Monday, June 29, 2009

The Kitchen

When last we left our heroes (MANY months ago), the kitchen cabinets around the fridge had to come down to accommodate bringing in the new fridge from the garage. From there, there was no turning back....

First, the bulkheads needed to be torn out. These things were HUGE (big enough that an adult could easily crawl through them- about 3 feet x 3 feet), and they took up so much head space, that we wanted them gone! I included the picture below to remind you how big they were, and the picture above shows how much open space there was as we started to remove them


Next came getting rid of the kids for the weekend to plastic off the whole kitchen. As with many old houses, the answer to "what lies beneath" usually includes the word asbestos.... (cue the ominous music). We bought haz-mat suits, masks, and hoods, in addition to a large air purifier, and started tearing out the parts of the kitchen suspected to contain asbestos...



Jeff doing demo in his suit and mask...


All done with bulkhead demo, and ready to bring in the big guns. Note though, that about 4 months passed between this picture and the one before it. In that time, this was as much of a kitchen as I had to use (including for Christmas....)
Bye bye old kitchen!! We saved the cabinets and they will be installed in the basement for storage, but that awful window and laminate countertops HAD to go!

So Brad came over for the day and Jeff took the day off, to completely demo the kitchen:

4 hours later, this is what it looked like!


Running the wiring for all of the separate kitchen circuits (7 I think!)
A little explanation on this one- this is probably the thing in the kitchen I am MOST proud of! The new plumbing had to run slightly below the joists in one area in order to have the proper grading. A small bulkhead had to be built to contain it. Now I had never done framing carpentry before, and frankly that full size nail gun is a bit intimidating, but with the encouragement of a friend (thanks Kev!), I decided to attempt building it myself. I can't tell you how excited I was when it fit on the first try!!



Drywall in the kitchen. Brad did the walls, Kevin did the ceiling (and Jeff ate Doritos- see previous post)


Starting to sand down the hardwood- the same floors that run through the rest of the house. You can also see the wonderful ceiling fan and pendant light that Jeff installed!

Starting to paint in preparation for cabinets. We picked a color that we liked, and then Jeff found it on the Oops Paint shelf @ Home Depot. YAY for $5 Oops paints!!



Dry-fitting the first cabinets. By the way, for those keeping track of our budget, we got our entire kitchen's worth of cabinets for under $2200!! They were 75% off clearance price at Lowes when they switched to a new stock cabinet brand. Between what they had in stock, and the display that we also bought (when they took it down), we were able to get cabinets for the whole kitchen!

The scary looking pipes under the sink- I would be replacing these later. We now have a brand new PVC drain (very proud of that work), and new copper supply lines (which Jeff soldered without any leaks on the first try!).


(Cue the choir of angels): CABINETS!

The built in cabinets by the fridge (and the small bulkhead that I built above it)

A close up view of our granite tile countertops. Did you know we got this for less than $1.50/ square foot? Also clearance at Lowes...



Starting the granite tile backsplash. We splurged on this one (but still got it on sale, since we got a 25% discount by using Brad's name), and the cost per square foot was $8.99. We chose the color to tie in the black appliances, and it has silver specks in it to tie in the stainless steel, and tan flecks to tie in the cabinets:

Tiles set, spacers in, waiting for the thinset to dry

Taking the spacers out and starting to clean up:

Cleaned up and ready for grout. We wanted it to look as continuous as possible, so we went with a black grout (I'll post pics of the tiles grouted later)

Our Kohler cast iron sink, getting ready to go in. Note that we will finally have a garbage disposal! My husband is so good at this stuff! :-)


Wiring in and installing the garbage disposal. I ran the drains after that was done


A close-up of our cabinet hardware. They were a price error on Lowe's website- 99 cents apiece.

A sink!!! The window behind it still needs to be trimmed out, but we have a working sink again!

Master Bathroom

When last I posted, the tile had been laid, but not grouted. So, here is a picture of the grouting, in process. We used black grout (since it will never look dirty! :-). and it was quite to mess to put on! Here I was waiting the 15 minutes for it to glaze over before I sponged it off of the tiles...


Next, it was time to install the toilet. In keeping with the house, NOTHING is easy. For those of who have installed a toilet, it is probably one of the simplest household installs ever! You set the new ring, set the toilet, sit on it to compress the ring, tighten carriage bolts and attach supply line. Unfortunately, that only works with the forgone conclusion that the floor is LEVEL. Yeah... go figure- old house.... floor not so level. I did my best to level it out with tile, but there were still some issues. After setting the toilet once and realized you would be rocking on it while sitting, we had to make the trip to the store to get toilet shims. Thankfully, they make wonderful little rubber shims just for cases such as this :-). Toilet problem solved!



Next, it was time to use painters tape on the walls to mark off where the stripes would be. Another issue with leveling... I found out that from the high corner of the room to the low corner, the floor drops more than an inch and a half. I decided to make the stripes level for sight purposes, but unfortunately that meant it took a LOT longer to mark off the stripes... (and a plug for a GREAT product I discovered- that green tape. It's called Frog Tape, and unlike regular painters tape, there is ZERO paint seepage under it. You get a crisp line every time- awesome!)


Next it was time for the finishing touches. Towel bars, wall art, etc...


And I thought this perspective shot was cool. It gives a good look at the room :-). I will post a few more pics later showing the window (once I finish the trim) and the door (also still needs to be trimmed out). But other than that, the bathroom is now FULLY FUNCTIONAL. YAY!!!!